Concrete Dry-Shake Hardeners
Sikafloor®-3 QuartzTop - Mineral Surface Hardener for Concrete
Sikafloor®-2 SynTop - Non-Metallic Hardener for Concrete Floors
Concrete dry-shake hardeners strengthen the surface of fresh concrete floors. Select by expected wear, traffic, finish requirements and installation method.
Selection and preparation
Distinguish a dry-shake hardener for fresh concrete from quartz sand used in resin flooring. They have different intended functions. Application timing, finishing and curing follow the exact technical sheet.
Product examples from the catalogue
- Sikafloor®-3 QuartzTop - Mineral Surface Hardener for Concrete
- Sikafloor®-2 SynTop - Non-Metallic Hardener for Concrete Floors
Quantity and technical enquiry
State the area or number of details, substrate, existing layers and service conditions. Calculate quantities and waiting times from the exact technical sheet and design. Send a technical enquiry.
Questions: concrete dry-shake hardeners
What are the materials intended for?
Concrete dry-shake hardeners strengthen the surface of fresh concrete floors. Select by expected wear, traffic, finish requirements and installation method.
What matters before selection?
Distinguish a dry-shake hardener for fresh concrete from quartz sand used in resin flooring. They have different intended functions. Application timing, finishing and curing follow the exact technical sheet.
Do all products in the category have the same role?
No. Check whether the item is a main material, primer, protective layer or accessory. Similar applications do not make products interchangeable.
How is compatibility checked?
Against the exact materials, substrate and sequence in the technical documentation. Follow the specified system where the project imposes requirements.
What determines the required quantity?
Area or number of details, dimensions, consumption, thickness and substrate condition. Check package contents and any additional components required.
When can work continue?
Follow the exact product requirements, temperature and next operation. Time before the next coat or operation may differ from time before full loading.
Which documents should I check?
The technical sheet, safety sheet and applicable system documents or approvals. Match the exact product and package to the project requirements.
How can I send a useful enquiry?
Describe the task, substrate, dimensions, loads and desired schedule. Include photographs or a design detail and any products already selected.
